Risk-aware scheduling framework for Toronto’s Line 1 (Yonge–University) subway that combines delay forecasting with MILP-based train frequency optimization.

Topic: toronto-transit — Toronto Transit Commission (TTC) analytics series.

Part of a Toronto transit analytics series: ttc-predict TTC-Line1-Optimization toronto-transit-sentiment-nlp interactive-transit-dashboard

Problem

Line 1 is the TTC’s busiest corridor, but passenger-related delays (overcrowding, alarm misuse, track entry) reduce reliability and increase operational cost.

Approach

Analyzed historical delay data from City of Toronto Open Data, forecast hourly disruption risk with Facebook Prophet, and optimized train frequency using mixed-integer linear programming (PuLP). Compared three scheduling strategies, selecting Modified Option 2 as the best cost–reliability balance.

Results

Strategy Avg Delay (min) Daily Savings
Option 1 – Min Freq 4.20 $47.7k
Modified Option 2 3.14 $6.6k
Option 3 – Max-Min 3.00 $0

Modified Option 2 reduced average peak-hour delay to 3.14 minutes while saving approximately $6,600 per day versus baseline scheduling.

Tech stack

Python, Facebook Prophet, PuLP, pandas, Jupyter notebooks

How to run

Recommended (Google Colab): Open In Colab

  1. Download the TTC subway delay dataset and upload to /data/.
  2. Run all cells in the notebook.

Local: clone the repo, install requirements.txt, place the CSV in data/, then run src/forecasting.py and src/optimization.py.

Screenshot / demo

See report/final_report.pdf and notebook outputs for forecast charts and optimized schedules. Project banner: TTC optimization .png.